Built to handle high-voltage challenges from the ground up: safe, reliable transmission line construction across all terrains and conditions.

  • 46 kV – 138 kV
  • Wood, concrete & steel structures
  • Off-road equipment
FINISHED GRADESUBSTATION446–138 kVSEE E-1022SPAN3Ø OVERHEAD1STORM DAMAGE5BOREIN ROCK6PADMOUNT3VAC HOSE7
Key plan · unit 2 of 7E-102

Overview

Everhart & Hoover has completed transmission projects from new extensions to complete rebuilds. Voltages have ranged from 46 kV to 138 kV, and designs have included single wood poles, 2- and 3-pole wood structures, self-supporting concrete, and steel poles.

We manage the logistics, specialized equipment, and regulatory requirements that come with greenfield builds, rebuilds, and voltage upgrades. Rough terrain, tight timelines, critical infrastructure: our crews are trained and equipped to deliver, safely and on schedule.

Building transmission lines takes planning, coordination, and precision at scale. We start with a detailed assessment of the route, terrain, and requirements. These lines don't just carry power; they carry responsibility.

Scope

What this unit covers on a typical job. Ask about anything that isn't listed.

  1. Transmission line construction
  2. Structure and pole installation
  3. Conductor stringing and sagging
  4. Guying and anchoring systems
  5. New line extensions and rebuilds
  6. 46 kV–138 kV system work
  7. Live-line capable crews
  8. Material and logistics coordination
  9. Right-of-way (ROW) compliance
  10. Hardware and insulator installation
  11. Foundation and framing work
  12. Storm damage restoration
  13. Off-road-accessible equipment
  14. Commissioning support

Site photographs

Lineman working aloft on a structure
Photo 1Lineman working aloft on a structure
E&H crane truck staged at a transmission structure
Photo 2E&H crane truck staged at a transmission structure

Questions, answered

The questions we hear most. Don't see yours? Ask us directly.

RFI-01What voltages do you work with for transmission projects?
Response

Typically 46 kV to 138 kV, with experience across a range of system designs and requirements.

RFI-02Can you handle difficult terrain or remote sites?
Response

Yes. Our crews are equipped for rugged, off-road conditions and have completed projects across challenging environments.

RFI-03Do you manage permits and right-of-way coordination?
Response

We work closely with engineers, utilities, and permitting agencies to support right-of-way access and compliance throughout the project.

RFI-04How do you ensure safety during high-voltage work?
Response

Safety is built into every step: strict protocols, ongoing crew training, and certified equipment for every task.

RFI-05How early should we involve your team?
Response

The earlier the better. Involving us during planning helps avoid delays, reduce costs, and keep the build smooth from start to finish.